Wednesday, January 23, 2008

Making Progress

I don't have any pictures this time . . . but, I wanted to fill you in on the progress we've been making. This past weekend, we used a laser level to determine the site elevation at different points. We will use this to decide how much dirt we need to order, to get the foundation to the right height and the yard graded.

Adam also set the truss designer, structural engineer, and geotechnical engineer (soil testing) loose to start their work. We should have their designs/tests soon and will then submit for permit with the county. This will probably still be another couple weeks.

Yesterday, Adam, Austin (Adam's assistant at work), and I started on the batter boards. I'll try and get a picture of that up soon. They are basically wooden boards that go outside the corners of the house. We will then tie stringline at the correct positions that will correspond to the outside perimeter of the house. We put up about 75% of the boards, but have not run the string yet.

That's about everything. Adam will be at a men's retreat with church this weekend, so I don't know how much work will get done in the upcoming days. As always, I'll try to keep this site up to date and will try and get a picture up soon of our latest feat.

Wednesday, January 16, 2008

Laying out the Corners


Adam and I layed out all the outside corners of our house last weekend.


Adam borrowed some survey equipment from a coworker, we marked all the distances and angles on the plans, and then we marked all the corners with stakes. So, I guess that means we officially broke ground. We didn't have a golden shovel - but, I'll work on getting a golden spoon or something.

We are still waiting on a few things before we can submit for permit - it's looking like it will be a few more weeks before everything is ready. In the mean time, I think we're going to order some dirt and get the site prepared. We are on our way!

Thursday, January 10, 2008

Checklist for Building Permit


We are currently gathering all the information we need to submit for permit with the county. This is an important step, because it means we will be able to begin construction of our house. We are not allowed to do any work without a permit. There is a fair bit of paper work we need to submit to be approved for our permit. I have posted a checklist (3 pages long) that Duval county gave us. We are using this to make sure we have everything we need to submit and have the greatest chance of being approved the first go round. You can click on the images to see what our county requires. I know it doesn't seem like much is happening right now, but all of this needs to happen in order to start building and see progress. Once we submit, it shouldn't take any longer than one week to hear back from them. Supposedly, Duval county is one of the more difficult counties to work with, I hope we don't have any problems with them. We hope to submit for permit very soon - hopefully by next week. I will keep you posted on our progress and will have pictures once we break ground.

Thursday, January 3, 2008

Floor Plans


This is the home we are going to build. It should look just like this, except the garage will be front facing on the left side of the house.


This is the first floor plan. It has 4 bedrooms and 3 bathrooms. I'm in love with the layout - we found and ordered the plans on www.architecturaldesigns.com.


This is the second floor. We're going to leave the upstairs as storage for now. In the future, we'll build it out to be an extra bedroom, gameroom, whatever. We know it's huge. But, I figured we're going to save money building it ourselves, so we should make it bigger, right? Well, it'll be great once it's done. Hopefully we can afford to live in it.