Thursday, October 14, 2010

Baseboards & Moving Date

We have been getting things finished up at the house. The main thing we've been working on has been the baseboards. We have them installed throughout most of the house. The only places we're missing now is closets and the hall. It's amazing how complete a room looks with the addition of this final trim.

The office.

From the Foyer, looking in the Dining Room on the left and Living Room on the right.

Master Bedroom.

We also have all the drawer pulls installed on the cabinets. Here's the Master Bath.

Besides baseboards & cabinet pulls . . . we set the washer and dryer, got the dumpster hauled away for the last time, began installing shelving in the Master Closet, began packing up the condo and moving some of our stuff into the house. We set our big move in date for this Saturday, Oct. 16th! We plan on finishing the rest of the punch list while living there. It'll be nice to take things slow.

Tuesday, October 5, 2010

WE PASSED!!

We just passed our Final Inspection with the county!! We are so thankful to be done with the county and have the Certificate of Occupancy in hand! Thank you to those that prayed for us, we are very excited!

We just submitted the paperwork to the bank, so we're waiting on them to get things wrapped up. Yay!

Monday, October 4, 2010

Sooooo Close

We are getting so very close to being done with the house!! The bank inspection went well on Friday, but the county inspection did not. We were left with a list of things to fix and a fee to pay. We managed to get everything complete this weekend and payed the fee first thing this morning. To make a long story short, the inspector will out there first thing tomorrow. This should mean a passed Final Inspection and a Certificate of Occupancy! We will then turn the form into the bank and get things wrapped up.

We finished the flooring! The last bit of flooring to be complete was the Master Bedroom. We installed the wood laminate and it looks great.

Master Bedroom - I'm looking forward to all the extra space.

The main reason we failed last week's inspection was because of the paper backing on the insulation upstairs. You are not allowed to have exposed kraft paper on the insulation in an open attic space. Apparently the insulators and inspector forgot this 4 months ago and it didn't get noticed until Friday. We were unsuccessful at contacting the insulators (didn't get failed until 4:30 pm on Friday). So, we spent a good chunk of the weekend taking the insulation down, pealing off the paper backing, and reinstalling it ourselves. This was an itchy and tedious job - NOT happy with the insulators about this. I'm thankful Brian & a friend helped us out with this.

Here's the insulation now, paper free.

And the other side of the attic.

After finishing up the flooring & insulation yesterday, we spent a few hours cleaning. We haven't been the best at picking up after each task recently and things really piled up. So, we cleaned the entire house and wow, what a difference. Here's some pictures:

We cleaned off the counter in the Jack and Jill Bathroom. The only thing it's missing now is the mirror.

The Guest Bath is also cleaned up and I added the glass around the light fixture. We have the mirrow for this bath, it's just not hung yet.

The hallway, without the cardboard walkway.

The Master Bath, clean counter. We're in the process if getting the drawer pulls in and drawer faces adjusted.

I finally caulked around the tub, but still have to caulk the top of the tile to wall and along the floor.

The Kitchen & Breakfast Nook from the Living Room. This was the first time we saw the floors together without them being covered up. We still need transition strips, but it's looking really nice.

Looking into the Foyer from the Living Room.

The Kitchen without that box on the counter. I like things being clean.

From the Foyer, into the Dining/Kitchen and Living Room.

The appraiser is coming out soon and we should get everything wrapped up with the construction loan this week. We can't wait for this to be done!

Friday, October 1, 2010

Covering Up Concrete

We have spent the last week covering up the concrete on the inside. It has been so nice to get finished flooring down! Carpet was installed Sept. 22nd. We put in the best pad, which makes it a very comfortable. The carpet is a "frieze" which is a short shag - I really like it. Check it out:

The back bedroom.

The other bedroom.

The master closet.

The stairs.

We have also been working on completing the wood flooring. We're making good progress, but it is a time-consuming process.

We finished the wood flooring in the Dining Room.

The Living Room in progress.

The finished Living Room. We ended up doing wood up to the fireplace, I think this is a nice look. The only room left for flooring is the Master Bedroom. As of last night, it is cleaned and ready for the wood to go down, which we'll start tonight.

Handrail for stairs. This was one of the requirements to get the Final Inspection.

We have the final inspection scheduled for today and hope we have everything ready for the inspector. The bank inspector is also due out today. These are both huge and have the potential to greatly help or hurt us. Please pray everything works in our favor.

Rewind: Driveway Pour

Adam informed me that my blog fans were rioting over not having these pictures. So, without further ado . . . here are the pictures from placing the concrete for the driveway on Sept. 9th: