Friday, October 1, 2010

Covering Up Concrete

We have spent the last week covering up the concrete on the inside. It has been so nice to get finished flooring down! Carpet was installed Sept. 22nd. We put in the best pad, which makes it a very comfortable. The carpet is a "frieze" which is a short shag - I really like it. Check it out:

The back bedroom.

The other bedroom.

The master closet.

The stairs.

We have also been working on completing the wood flooring. We're making good progress, but it is a time-consuming process.

We finished the wood flooring in the Dining Room.

The Living Room in progress.

The finished Living Room. We ended up doing wood up to the fireplace, I think this is a nice look. The only room left for flooring is the Master Bedroom. As of last night, it is cleaned and ready for the wood to go down, which we'll start tonight.

Handrail for stairs. This was one of the requirements to get the Final Inspection.

We have the final inspection scheduled for today and hope we have everything ready for the inspector. The bank inspector is also due out today. These are both huge and have the potential to greatly help or hurt us. Please pray everything works in our favor.