Adam and his dad filled the screw holes on the porch with Bondo. They also will fill the seams and sand everything down before painting it white.
The ductwork is coming along great. Here's the duct in our attic space.
The exhaust fans in the bathrooms are in as well.
The garage door was installed on Wednesday last week.
The house is really coming together now. It is also finally secure!Adam and his Dad started installing the electrical wiring. Here's some of their handy work.
.jpg)
.jpg)
.jpg)
.jpg)
The front door won't be in until the new year. The ductwork should be finished in a week and we'll get our mechanical inspection before Christmas. We may even have the electrical finished before Christmas as well. Then, we just need to finish the insulation in the walls and it's drywall time. Very exciting stuff.
No comments:
Post a Comment