The insulators put batt insulation above the walls in the dormers.
The soffits on the dormers were finished up Monday, Nov. 9th.
The curb appeal is coming along well.
We installed the glass inserts with integral blinds on the three back porch doors.
This is the meteor shower . . . okay, not really . . . but here's the house with the soffits and arches complete (in the rain).
Here are the glass inserts & hardware installed on the back porch doors. It's looking nice.
We wrapped the bottom and back of the back porch beam. The areas above the columns are getting additional trim, but it's not on yet.
The front porch today.
The siding on the sides of the porch is on - it just needs to be caulked and painted. You can also see the porch arches well.
Insulation on the left side of the bonus area.
Insulation on the right side of the bonus area.
The wall for the HVAC closet was built.
The ductwork above the bonus area that is heading toward the back bedrooms. We are going to have three zones on seperatae thermostats - master suite, back bedrooms and the common area.
The ductwork over the kitchen.
The duct going into the living room. We are putting in sheet metal - which is mainly a commercial installation. But, I work for a mechanical contractor and designed a really great duct system (if I do say so myself), so we are getting a top notch system.Earlier today I spotted a snake on the front porch. It was scared of us and went under the peel and stick along the bottom of the porch. Unfortunately, the snake didn't know that the back of this is very sticky . . .
Adam and his dad got him off of there . . . but he didn't live long after that. The garage door will go in next week and the front door is on the way. Things are looking great. Have a wonderful Thanksgiving!