There has been a lot going on at the Harris house the past couple weeks.
The foyer and master bath tile have been grouted. Here is the foyer. We also sealed the grout, which should keep it protected.
Here is the Master shower & tub, complete with shower heads. This has grout, but I’m not quite finished with the caulking around the edges/corners. We are getting pricing for a glass enclosure.
Here’s our water heater. We have our electrical final scheduled for tomorrow. We needed the water heater installed for this inspection.
Our kitchen – notice the tile is not covered up and the faucet is installed. We also have the garbage disposal hooked up.
Our dishwaster . . . just kidding, Mom. Thanks for helping out this weekend, Mom & Dad.
Okay, here’s our real dishwasher, hooked up and ready to wash.
Let me show you the rest of our plumbing fixtures:
Double sink in the Jack & Jill Bathroom.
Under one of the sinks. We have to fix the toilet in this bathroom and then we should be ready for the final plumbing inspection.
The vanity and toilet all finished in the Hall Bath. These are now functional and we got our portolet hauled away – yippee!
The Master Bath Sink – this is one of two and the faucets are goosenecks, which is fun.
Master Toilet
We also finished the door going to the toilet room. This door gave us quite a bit of trouble, but it’s all fixed now.
The window sills are all in – thanks for helping us out, Nels!
Guest Bedroom. We kept the edges long in case we ever want to add casing around the windows later.
Dining Room. We ran the sills across double windows to make one large sill.
Our fireplace. This has been installed for awhile now, but it’s been covered up until recently. The hood in the bubble wrap inside goes over the blank spot above the doors.
There was a lot of painting and caulking completed this weekend too. Thanks to Adam’s dad for helping us out so much!! Up next: dirt and concrete for the front yard.