We finished laying the tile in the Master Bathroom and the Foyer. I think it turned out great. They both still need to be grouted, but hopefully that will be taken care of soon. Now, the only remaining tile is a small patch in front of the fireplace. We’re happy to have it almost done. Check out our work:

Master Tub.

Master Shower. The glass walls and door are going to make this area really come together.

Adam starting the foyer. We did the same layout as the kitchen, a diagonal brick pattern.

The completed foyer.

We also finished installing the interior doors. Here are the doors to closets off of the Master Bath.

Here is our laminate wood flooring. We have all the material delivered and the plan is to install it after the landscaping and driveway are complete.

We are officially not doing any more cutting inside the house – I don’t want saw dust on my new granite. So, we cleaned out the living room.

And we moved the saws into the garage. Here’s our new work station. We cleaned up the garage a bit, so this was a very nice improvement.

We began installing the plumbing fixtures yesterday. Here is the shower/bath in the Hall Bath. We also installed the sink faucet, but I forgot to get a picture.

And here is the Jack and Jill bath. The water heater is also installed. We should have the rest of the fixtures in soon.

We need to complete the tile, casing around the doors and plumbing fixtures. Then we’ll move outside to the irrigation, landscaping and concrete work. 